chore(release): ensure a copy of the license is included with published packages #5954
pr-integration.yml
on: pull_request
Integration Tests - PR
/
prepare-integration-tests
6m 4s
Matrix: Integration Tests - PR / linux_integration
Matrix: Integration Tests - PR / windows_integration
Integration Tests - PR - Result
0s
Annotations
3 warnings
Integration Tests - PR / linux_integration (python/providers/test.ts, 1.6.5, true)
Docker pull failed with exit code 1, back off 6.063 seconds before retry.
|
Integration Tests - PR / linux_integration (go/provider-upgrade-command/test.ts, 1.6.5, true)
Docker pull failed with exit code 1, back off 6.739 seconds before retry.
|
Integration Tests - PR / linux_integration (python/providers/test.ts, 1.5.5, false)
Docker pull failed with exit code 1, back off 3.001 seconds before retry.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
dist
|
23.1 MB |
|
edge-provider-bindings
|
653 KB |
|