Skip to content

feat: added slog adapter #1229

feat: added slog adapter

feat: added slog adapter #1229

Re-run triggered March 12, 2024 14:46
Status Failure
Total duration 1m 42s
Artifacts

go.yml

on: pull_request
Matrix: Build and test
Fit to window
Zoom out
Zoom in

Annotations

8 errors
Build and test (ubuntu-latest, 1.20.x): fxevent/slog.go#L25
package log/slog is not in GOROOT (/opt/hostedtoolcache/go/1.20.14/x64/src/log/slog)
Build and test (ubuntu-latest, 1.20.x)
Process completed with exit code 2.
Build and test (windows-latest, 1.20.x)
The job was canceled because "ubuntu-latest_1_20_x" failed.
Build and test (windows-latest, 1.20.x)
The operation was canceled.
Build and test (windows-latest, 1.21.x)
The job was canceled because "ubuntu-latest_1_20_x" failed.
Build and test (windows-latest, 1.21.x)
The operation was canceled.
Build and test (ubuntu-latest, 1.21.x)
The job was canceled because "ubuntu-latest_1_20_x" failed.
Build and test (ubuntu-latest, 1.21.x)
The operation was canceled.