Skip to content

chore(deps): update dependency husky to v9 #3012

chore(deps): update dependency husky to v9

chore(deps): update dependency husky to v9 #3012

Triggered via push May 17, 2024 18:29
Status Failure
Total duration 50s
Artifacts

node-ci.yml

on: push
Matrix: verify-matrix
release  /  release
release / release
Fit to window
Zoom out
Zoom in

Annotations

13 errors
verify-matrix (12.0.0)
Process completed with exit code 1.
verify-matrix (14.0.0)
The job was canceled because "_12_0_0" failed.
verify-matrix (14.0.0)
Process completed with exit code 1.
verify-matrix (16.0.0)
The job was canceled because "_12_0_0" failed.
verify-matrix (16.0.0)
The operation was canceled.
verify-matrix (18)
The job was canceled because "_12_0_0" failed.
verify-matrix (18)
The operation was canceled.
verify-matrix (14)
The job was canceled because "_12_0_0" failed.
verify-matrix (14)
Process completed with exit code 1.
verify-matrix (19)
The job was canceled because "_12_0_0" failed.
verify-matrix (19)
The operation was canceled.
verify-matrix (16)
The job was canceled because "_12_0_0" failed.
verify-matrix (16)
The operation was canceled.