chore(deps): update node.js to v18 #896
before-merge.yml
on: push
Lint, Unit Test and Build
6h 0m
Matrix: E2E Test
Annotations
2 errors
Lint, Unit Test and Build
The job running on runner GitHub Actions 2 has exceeded the maximum execution time of 360 minutes.
|
Lint, Unit Test and Build
The operation was canceled.
|