chore: fix build status badge #597
continuous-integration.yml
on: pull_request
Matrix: Expect tests
Check Composer
8s
Static analysis
5s
Annotations
7 errors
Code coverage
Process completed with exit code 1.
|
Run action (windows-latest, lowest, v2, tests/fixtures/no-lock-file)
curl error 28 while downloading https://repo.packagist.org/packages.json: SSL connection timeout
|
Run action (windows-latest, lowest, v2, tests/fixtures/no-lock-file)
Process completed with exit code 1.
|
Run action (windows-latest, lowest, v2, tests/fixtures/with-lock-file)
The job was canceled because "windows-latest_lowest_v2_tests_fixtures_no-lock-file" failed.
|
Run action (windows-latest, lowest, v1, tests/fixtures/no-lock-file)
The job was canceled because "windows-latest_lowest_v2_tests_fixtures_no-lock-file" failed.
|
Run action (windows-latest, lowest, v1, tests/fixtures/no-lock-file)
The operation was canceled.
|
Run action (windows-latest, lowest, v1, tests/fixtures/out-of-sync-lock)
The job was canceled because "windows-latest_lowest_v2_tests_fixtures_no-lock-file" failed.
|