Skip to content

Add logs to dice example #12396

Add logs to dice example

Add logs to dice example #12396

Triggered via pull request May 13, 2024 18:01
Status Failure
Total duration 2m 48s
Artifacts 1

ci.yml

on: pull_request
Matrix: compatibility-test
test-compatibility
0s
test-compatibility
Fit to window
Zoom out
Zoom in

Annotations

23 errors
compatibility-test (~1.21.10, ubuntu-latest, amd64)
Process completed with exit code 2.
compatibility-test (~1.21.10, ubuntu-latest, 386)
Process completed with exit code 2.
compatibility-test (~1.21.10, windows-latest, 386)
The job was canceled because "_1_21_10_ubuntu-latest_am" failed.
compatibility-test (~1.21.10, windows-latest, 386)
The operation was canceled.
compatibility-test (~1.22.3, windows-latest, amd64)
The job was canceled because "_1_21_10_ubuntu-latest_am" failed.
compatibility-test (~1.22.3, windows-latest, amd64)
The operation was canceled.
compatibility-test (~1.21.10, windows-latest, amd64)
The job was canceled because "_1_21_10_ubuntu-latest_am" failed.
compatibility-test (~1.21.10, windows-latest, amd64)
The operation was canceled.
compatibility-test (~1.22.3, windows-latest, 386)
The job was canceled because "_1_21_10_ubuntu-latest_am" failed.
compatibility-test (~1.22.3, windows-latest, 386)
The operation was canceled.
compatibility-test (~1.22.3, ubuntu-latest, 386)
The job was canceled because "_1_21_10_ubuntu-latest_am" failed.
compatibility-test (~1.22.3, ubuntu-latest, 386)
The operation was canceled.
compatibility-test (~1.22.3, ubuntu-latest, amd64)
The job was canceled because "_1_21_10_ubuntu-latest_am" failed.
compatibility-test (~1.22.3, ubuntu-latest, amd64)
The operation was canceled.
compatibility-test (~1.21.10, actuated-arm64-2cpu-8gb, arm64)
The job was canceled because "_1_21_10_ubuntu-latest_am" failed.
compatibility-test (~1.21.10, actuated-arm64-2cpu-8gb, arm64)
The operation was canceled.
compatibility-test (~1.22.3, macos-latest, amd64)
The job was canceled because "_1_21_10_ubuntu-latest_am" failed.
compatibility-test (~1.22.3, macos-latest, amd64)
The operation was canceled.
compatibility-test (~1.22.3, actuated-arm64-2cpu-8gb, arm64)
The job was canceled because "_1_21_10_ubuntu-latest_am" failed.
compatibility-test (~1.22.3, actuated-arm64-2cpu-8gb, arm64)
The operation was canceled.
compatibility-test (~1.21.10, macos-latest, amd64)
The job was canceled because "_1_21_10_ubuntu-latest_am" failed.
compatibility-test (~1.21.10, macos-latest, amd64)
The operation was canceled.
lint
Process completed with exit code 2.

Artifacts

Produced during runtime
Name Size
opentelemetry-go-test-output
317 KB