Skip to content

Integrate io_uring transport into 4.2 #5415

Integrate io_uring transport into 4.2

Integrate io_uring transport into 4.2 #5415

Triggered via pull request May 10, 2024 14:12
Status Failure
Total duration 6h 5m 19s
Artifacts 15

ci-pr.yml

on: pull_request
windows-x86_64-java11-boringssl
1h 5m
windows-x86_64-java11-boringssl
Matrix: build-pr-cross
Matrix: build-pr
Fit to window
Zoom out
Zoom in

Annotations

10 errors
linux-x86_64-java11-graal build
Process completed with exit code 1.
linux-x86_64-java11-adaptive build
Process completed with exit code 1.
linux-x86_64-java22 build
Process completed with exit code 1.
linux-x86_64-java11 build
Process completed with exit code 1.
linux-x86_64-java21 build
Process completed with exit code 1.
linux-x86_64-java17 build
Process completed with exit code 1.
linux-x86_64-java11-boringssl build
The job running on runner GitHub Actions 15 has exceeded the maximum execution time of 360 minutes.
linux-x86_64-java8 build
The job running on runner GitHub Actions 5 has exceeded the maximum execution time of 360 minutes.
linux-x86_64-java11-boringssl build
The operation was canceled.
linux-x86_64-java8 build
The operation was canceled.

Artifacts

Produced during runtime
Name Size
build-linux-x86_64-java11-adaptive-target
3 MB
build-linux-x86_64-java11-graal-target
2.95 MB
build-linux-x86_64-java11-target
3.06 MB
build-linux-x86_64-java17-target
3.39 MB
build-linux-x86_64-java21-target
3.48 MB
build-linux-x86_64-java22-target
3.2 MB
test-results-linux-x86_64-java11
2.31 MB
test-results-linux-x86_64-java11-adaptive
2.32 MB
test-results-linux-x86_64-java11-boringssl
2.2 MB
test-results-linux-x86_64-java11-graal
2.3 MB
test-results-linux-x86_64-java17
2.3 MB
test-results-linux-x86_64-java21
2.26 MB
test-results-linux-x86_64-java22
2.14 MB
test-results-linux-x86_64-java8
2.18 MB
test-results-windows-x86_64-java11-boringssl
2.52 MB