Skip to content

Use the ruff formatter, add more ruff linter rules #226

Use the ruff formatter, add more ruff linter rules

Use the ruff formatter, add more ruff linter rules #226

Triggered via pull request December 22, 2023 23:10
Status Failure
Total duration 33s
Artifacts

main.yml

on: pull_request
Matrix: collateral
Matrix: test
release
0s
release
Fit to window
Zoom out
Zoom in

Annotations

18 errors
collateral (docs)
Process completed with exit code 1.
test (3.11, ubuntu-latest)
Process completed with exit code 1.
test (3.12, windows-latest)
The job was canceled because "_3_11_ubuntu-latest" failed.
test (3.9, ubuntu-latest)
The job was canceled because "_3_11_ubuntu-latest" failed.
test (3.8, macos-latest)
The job was canceled because "_3_11_ubuntu-latest" failed.
test (3.12, macos-latest)
The job was canceled because "_3_11_ubuntu-latest" failed.
test (3.12, ubuntu-latest)
The job was canceled because "_3_11_ubuntu-latest" failed.
test (3.8, ubuntu-latest)
The job was canceled because "_3_11_ubuntu-latest" failed.
test (3.8, windows-latest)
The job was canceled because "_3_11_ubuntu-latest" failed.
test (pypy3.10, ubuntu-latest)
The job was canceled because "_3_11_ubuntu-latest" failed.
collateral (diffcov)
Process completed with exit code 1.
test (3.11, macos-latest)
The job was canceled because "_3_11_ubuntu-latest" failed.
test (3.11, macos-latest)
Process completed with exit code 1.
test (3.11, windows-latest)
The job was canceled because "_3_11_ubuntu-latest" failed.
test (3.11, windows-latest)
The operation was canceled.
test (3.10, ubuntu-latest)
The job was canceled because "_3_11_ubuntu-latest" failed.
test (3.10, ubuntu-latest)
The operation was canceled.
check
Process completed with exit code 1.