Skip to content

Istio Release 1.22

zirain edited this page Apr 13, 2024 · 3 revisions

Timeline

  • Branch Cut / Feature Freeze: April 15th, 2024 April 22nd, 2024
  • Code Freeze / Release Candidate: May 6th, 2024
  • Expected Release Date: May 13th, 2024

Point releases

Release Managers

How do I get my changes into the release?

On April 22nd, 2024, the primary RM will create the release-1.22 branch, based on master. Any changes on master before this date will be included in the release. Any changes after will have to be cherry picked.

To get a PR merged into the release branch, it must first be merged into the master branch. PRs can automatically be cherrypicked by typing by adding the cherrypick/release-1.22 label to the PR.

A PR on the release branch will only be approved if:

  • The change is already on master.
    • exception: if a change only applies to the release branch, and should not go to master, a change can be submitted directly to the release branch, but please note this in the PR description.
  • The change is a bug fix, documentation enhancement, or testing enhancement.
    • Changes that are risky may require a feature flag, especially after the 1.22.0 release.
    • Any change not meeting the above, such as a new feature or API, may require TOC approval.

Note: on the istio.io repo, changes should go directly to master until after the 1.22.0 launch. The changes will appear on preliminary istio.io.

Dev Environment

Writing Code

Pull Requests

Testing

Performance

Releases

Misc

Central Istiod

Security

Mixer

Pilot

Telemetry

Clone this wiki locally