Skip to content

chore(deps): update rust crate color-backtrace to 0.6.1 - autoclosed #509

chore(deps): update rust crate color-backtrace to 0.6.1 - autoclosed

chore(deps): update rust crate color-backtrace to 0.6.1 - autoclosed #509

Triggered via pull request May 1, 2024 10:34
Status Failure
Total duration 3m 23s
Artifacts

ci.yml

on: pull_request
Pull Request Check  /  Check Commit Message
3s
Pull Request Check / Check Commit Message
Pull Request Check  /  Check Format
13s
Pull Request Check / Check Format
Matrix: linux
Matrix: macos
Matrix: windows
Fit to window
Zoom out
Zoom in

Annotations

10 errors
macos (beta)
Process completed with exit code 101.
macos (stable)
The job was canceled because "beta" failed.
macos (stable)
The operation was canceled.
macos (stable minus 6 releases)
The job was canceled because "beta" failed.
macos (stable minus 6 releases)
The operation was canceled.
windows (beta)
Process completed with exit code 1.
windows (stable minus 6 releases)
The job was canceled because "beta" failed.
windows (stable minus 6 releases)
The operation was canceled.
windows (stable)
The job was canceled because "beta" failed.
windows (stable)
The operation was canceled.