Skip to content

build(deps): bump morphy2k/revive-action from 2.5.4 to 2.5.5 #705

build(deps): bump morphy2k/revive-action from 2.5.4 to 2.5.5

build(deps): bump morphy2k/revive-action from 2.5.4 to 2.5.5 #705

Triggered via pull request January 5, 2024 14:42
Status Failure
Total duration 47s
Artifacts

go.yml

on: pull_request
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

11 errors and 6 warnings
Test on go 1.19 and ubuntu-latest
Docker build failed with exit code 1
Test on go 1.20 and ubuntu-latest
The job was canceled because "ubuntu-latest_1_19" failed.
Test on go 1.20 and ubuntu-latest
Docker build failed with exit code 1
Test on go 1.21 and windows-latest
The job was canceled because "ubuntu-latest_1_19" failed.
Test on go 1.21 and windows-latest
The operation was canceled.
Test on go 1.19 and windows-latest
The job was canceled because "ubuntu-latest_1_19" failed.
Test on go 1.19 and windows-latest
The operation was canceled.
Test on go 1.20 and windows-latest
The job was canceled because "ubuntu-latest_1_19" failed.
Test on go 1.20 and windows-latest
The operation was canceled.
Test on go 1.21 and ubuntu-latest
The job was canceled because "ubuntu-latest_1_19" failed.
Test on go 1.21 and ubuntu-latest
The operation was canceled.
Test on go 1.19 and ubuntu-latest
Docker build failed with exit code 1, back off 3.584 seconds before retry.
Test on go 1.19 and ubuntu-latest
Docker build failed with exit code 1, back off 4.191 seconds before retry.
Test on go 1.20 and ubuntu-latest
Docker build failed with exit code 1, back off 6.936 seconds before retry.
Test on go 1.20 and ubuntu-latest
Docker build failed with exit code 1, back off 3.627 seconds before retry.
Test on go 1.21 and ubuntu-latest
Docker build failed with exit code 1, back off 4.904 seconds before retry.
Test on go 1.21 and ubuntu-latest
Docker build failed with exit code 1, back off 7.636 seconds before retry.