Skip to content

COLM

COLM #911

Triggered via pull request May 11, 2024 20:06
Status Failure
Total duration 3m 12s
Artifacts

aes-gcm.yml

on: pull_request
Matrix: build
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

14 errors
build (1.65.0, armv7a-none-eabi)
Process completed with exit code 101.
build (stable, thumbv7em-none-eabi)
The job was canceled because "_1_65_0_armv7a-none-eabi" failed.
build (stable, wasm32-unknown-unknown)
The job was canceled because "_1_65_0_armv7a-none-eabi" failed.
build (stable, armv7a-none-eabi)
The job was canceled because "_1_65_0_armv7a-none-eabi" failed.
build (1.65.0, wasm32-unknown-unknown)
The job was canceled because "_1_65_0_armv7a-none-eabi" failed.
build (1.65.0, thumbv7em-none-eabi)
The job was canceled because "_1_65_0_armv7a-none-eabi" failed.
build (1.65.0, thumbv7em-none-eabi)
Process completed with exit code 101.
test (x86_64-unknown-linux-gnu, stable)
Process completed with exit code 101.
test (x86_64-unknown-linux-gnu, 1.72.0)
The job was canceled because "x86_64-unknown-linux-gn_2" failed.
test (x86_64-unknown-linux-gnu, 1.72.0)
Process completed with exit code 101.
test (i686-unknown-linux-gnu, 1.72.0, sudo apt update && sudo apt install gcc-multilib)
The job was canceled because "x86_64-unknown-linux-gn_2" failed.
test (i686-unknown-linux-gnu, stable, sudo apt update && sudo apt install gcc-multilib)
The job was canceled because "x86_64-unknown-linux-gn_2" failed.