Bump the crates-io group across 1 directory with 29 updates #3935
test.yml
on: pull_request
Matrix: check
Matrix: Test Auditwheel
Matrix: Test Bootstrap
Matrix: Test Cross Compile
Matrix: test-downstream
Waiting for pending jobs
Test Emscripten
0s
Test Alpine Linux
0s
Test Docker
0s
Test MSRV
16s
Test Pyston
0s
Generate Matrix
4s
Matrix: Test
conclusion
0s
Annotations
17 errors
Test MSRV
Process completed with exit code 101.
|
Test Bootstrap (ubuntu-latest)
Process completed with exit code 101.
|
Test Bootstrap (windows-latest)
The job was canceled because "ubuntu-latest" failed.
|
Test Bootstrap (windows-latest)
The operation was canceled.
|
Test Bootstrap (macos-14)
The job was canceled because "ubuntu-latest" failed.
|
Test Bootstrap (macos-14)
[notice] A new release of pip is available: 23.0.1 -> 24.0
[notice] To update, run: python3.10 -m pip install --upgrade pip
|
Test Bootstrap (macos-14)
The operation was canceled.
|
Test (ubuntu-latest, 3.12)
Process completed with exit code 101.
|
Test (ubuntu-latest, pypy3.10)
The job was canceled because "ubuntu-latest_3_12" failed.
|
Test (ubuntu-latest, pypy3.10)
Process completed with exit code 101.
|
Test (macos-14, 3.12)
The job was canceled because "ubuntu-latest_3_12" failed.
|
Test (macos-14, 3.12)
The operation was canceled.
|
Test (windows-latest, 3.12)
The job was canceled because "ubuntu-latest_3_12" failed.
|
Test (windows-latest, 3.12)
The operation was canceled.
|
Test (windows-latest, pypy3.10)
The job was canceled because "ubuntu-latest_3_12" failed.
|
Test (windows-latest, pypy3.10)
The operation was canceled.
|
conclusion
Process completed with exit code 1.
|