My solution for Parallel-machine multitask flowshop scheduling problem

Notifications You must be signed in to change notification settings

Kruszylo/pm-flowshop-scheduling-problem

Repository files navigation

Parallel-machine flowshop scheduling problem

This project requires IBM ILOG CPLEX Optimization Studio 12.8.0

(https://www.ibm.com/support/knowledgecenter/SSSA5P_12.8.0/ilog.odms.studio.help/Optimization_Studio/topics/COS_relnotes_intro.html)

Description

The first line contains two numbers m and n, the first of which is the number of tasks and the second one is the number of machines. In the following lines there is a description of m tasks (machine number, time of execution on this machine). We assume the prefix dependency according to the order of the definition of the operation

We assume that the machines from 0-4 have k copies and the remaining 1 copy, where k is from 1 to 5 and is given as a parameter for running the program.

The aim is to minimize the end of the last operation.

To run the program:

titov.py path_to_folder_with_input_data -k

The command is to run the program on all files in the input folder train and return the file describing the solution to everyone. The last parameter denotes the number of machines no. 0-4.

Output file format

For a given set, n lines should be returned, each of which describes the sequence of tasks performed on a given machine (job number, start time) written out in ascending order of start times (each number is separated by a space). In the last line n+1 enter the value of the macespan and the time of program execution (I know that the time depends on the computer).

About

My solution for Parallel-machine multitask flowshop scheduling problem

Resources

Stars

Watchers

Forks

Releases

No releases published

Packages

No packages published

Languages