The Task Date is not displayed visually, and there are inconsistencies with the date field of the Planned Task with the Task Date. #17096

Open
2 tasks done
jcervantes-sipecom opened this issue May 10, 2024 · 0 comments

Comments

@jcervantes-sipecom
Copy link

Code of Conduct

  • I agree to follow this project's Code of Conduct

Is there an existing issue for this?

  • I have searched the existing issues

Version

10.0.15 and SaaS Cloud

Bug description

It's something based on an already past reported ticket:

  1. Task Date does not appear to be visible in the ticket, just the Creation Date, and Planned Date. The only one way to view the Task Date is editing the Task, but when a Ticket is Solved/Closed, the Task Cannot be edited so the Task Date cannot be saw. Sometimes the Task Date for a closed ticket is necessary to see for auditing or checking when a task was done and how much duration was.

  2. Also when a Task is planned, the Start Date doesn't update the Task Date, just the Duration.

  3. When a Planned Task is unplanned, this removes the duration of the task.

Relevant log output

No response

Page URL

No response

Steps To reproduce

  1. Create a Task.
  2. Set the Date another date instead the actual maybe yesterday, and duration. Save it.

image

  1. As you can see only the creation date and duration is visible, the date of the task is not.

image

  1. The date only can be saw if the task is editing. So if ticket is closed, the date of the task cannot be saw anymore.

  2. If task is planned, the planned date and duration is showing:

image

  1. Also the Planned Date doesn't update the Task Date. Plan the task, set a Planned Date and Period, save it:

image

image

image

  1. As you can see the Period update the Duration, but the Planned Date (Start date) doesn't update the Task Date.
  2. Also, If the task is unplanned, the duration is removed. Edit the task, clic in Unplan, check the Duration was removed:

image

image

Your GLPI setup information

In Cloud I cannot see this info.

Anything else?

Maybe one solution for the 1) will be something like this pull request: